Kenh Dong Water Treatment Project – HCMC
Kenh Dong Water Treatment Plant – Ho Chi Minh City
The project aimed to ensure a stable water supply for Ho Chi Minh City through the installation of high-capacity pumping systems at Kenh Dong Water Treatment Plant. We supplied KSB water pumps designed for continuous operation, high flow rates, and long-term reliability in urban water supply infrastructure.
Category: Water Supply / Infrastructure
Project: Kenh Dong Water Treatment Plant
Client: Kenh Dong Water Supply Joint Stock Company
Location: Kenh Dong Area, Ho Chi Minh City, Vietnam
Project Duration: January 2010 – June 2012
Scope of Work: Equipment Supply
Supplied Equipment:
– KSB water pumping system (Germany)
Key Technical Specifications:
– Power: 315 kW
– Flow rate: 1,800 m³/h
– Head: 45 m

